B-THERMIQ® Projects
Discover some of the projects completed using B-THERMIQ® solutions on façades, interiors and roofs. These case studies show how you can enhance thermal comfort and tackle moisture issues with a fast, discreet, effective and eco-friendly intervention.
LSF House
The dwelling was built using the Light Steel Frame (LSF) system, characterized by rapid construction and high structural efficiency. The application of a 0.5 mm layer of B-THERMIQ® Outside ensured a reinforcement of the thermal insulation without increasing the thickness of the building envelope. The bidirectional reflective solution significantly reduced heat exchange, improving interior comfort and preventing moisture formation, all while preserving the facade’s original aesthetic.
Casa de madera
Terraza de la 1ª planta
Urban renovation
9,000 m2 facade rehabilitation, composed of masonry walls and hollow brick. The material heterogeneity compromised the thermal performance and aggravated problems with interior comfort. The 0.5 mm B-THERMIQ® Outside solution was applied, ensuring high solar reflectivity and thermal emissivity. The system standardized the envelope’s performance, reducing heat gains in the summer and energy losses in the winter, all while maintaining the facade’s original aesthetic and respecting the project deadlines.
Twin house
Apartments
Two-family house
Villa
Apartment Interior
Heritage Building
Indoor Garage
Cubierta
Asphalt tile roof.
Duration of work: 3 days
B-THERMIQ® 0.5 mm roofing.
This apartment had an air conditioning problem because the roof had no thermal insulation.
After applying a specific B-THERMIQ® primer, we used B-THERMIQ® Roofing, which succeeded in reducing the surface temperature by 20º on the first application.
House
Challet
Masonry construction
Work duration: 16 days
B-THERMIQ® Exterior 0.5 mm applied to the entire exterior of the house (in 3 colors).
B-THERMIQ® Interior 0.5 mm applied in underground areas without exterior access.
B-THERMIQ® Floor to insulate the floor (1 mm between slabs).
B-THERMIQ® Roof 0.5 mm to insulate the slab.
The thermal priority of this complete renovation was to find an effective solution to the region’s temperature variations and the corresponding energy costs.
Villa
Masonry construction with stone cladding.
Project duration: 13 days
Thermal insulation with 0.5 mm B-THERMIQ® Outside, in the chosen colour.
House with several thermal deficiencies; the client’s priority was to preserve the façade and insulate the stone-clad jambs and thresholds.
On one side, it creates a good environment. On the other hand, it’s good for the environment.
With B-THERMIQ®, you also save the planet.